|Listed in category:
Have one to sell?

Integrating Kanban with MRP II (c): Automating ... by Louis, Raymond S. Hardback

US $7.50
ApproximatelyRM 31.84
or Best Offer
Condition:
Like New
Breathe easy. Returns accepted.
Shipping:
Free USPS Media MailTM.
Located in: Cary, North Carolina, United States
Delivery:
Estimated between Wed, 18 Jun and Tue, 24 Jun to 94104
Delivery time is estimated using our proprietary method which is based on the buyer's proximity to the item location, the shipping service selected, the seller's shipping history, and other factors. Delivery times may vary, especially during peak periods.
Returns:
30 days return. Buyer pays for return shipping. If you use an eBay shipping label, it will be deducted from your refund amount.
Coverage:
Read item description or contact seller for details. See all detailsSee all details on coverage
(Not eligible for eBay purchase protection programmes)
Seller assumes all responsibility for this listing.
eBay item number:166280195935

Item specifics

Condition
Like New: A book in excellent condition. Cover is shiny and undamaged, and the dust jacket is ...
ISBN
9781563271823

About this product

Product Information

If you manage inventory, you probably use MRPII, a system based on a push method that embraces work and purchase order execution. MRPII helps you plan and integrate data relevant to your entire organization. But, when you have shifts in demand, you have to: 1) Realign and cancel hundreds of open manufacturing and purchase orders, and then 2) issue new orders. Another system, kanban, is designed specifically to replenish inventory in just-in-time manufacturing. As consumption occurs, the kanban manual system triggers replenishment signals to the source of supply, so that both production and the supplier are constantly reacting to actual consumption. Compared to MRPII, kanban lowers inventory and minimizes shortages. But the manual process of recalculating every part number by hand, and triggering replenishment by faxing or calling suppliers, is time consuming and non-value-adding. Automating kanban by blending the planning strength of MRPII with manual kanban pull methods enhances your flexibility and competitive position. MRP's forward projection capability is used to: recalculate kanban lot size. perform a simulation to protect against non-linear demand. inform production areas and suppliers of the anticipated demand levels for resource planning. calculate staffing requirements for flexible work cells. This system: Automatically recalculates and triggers replenishment. Integrates suppliers into the manufacturing loop. Uses bar codes to enhance speed and accuracy of the receipt process. Before moving in this direction, preparatory work is required. Work cells should be constructed with material located at the point of use. Container options and transportation methods need to be selected, kanban lot size calculations, and work cell staffing modules to develop. This book will help you deal with these and other topics. You will be able to take advantage of the author's expertise in the design, implementation and evaluation of these systems. Chapters Eliminate Replenishment System Waste Replenishment System Basics Automated Kanban -- The Automated Flow Technology Kanban Prerequisites -- WCM Techniques Implementing Kanban Kanban and MRPII System Integration AFT Caculations for Determining Kanban Lot Sizes and Staffing Levels Perpetuation of the Automated Kanban Key Topics of the Automated Kanban System Three examples of AFT Implementation

Product Identifiers

Publisher
Productivity Press
ISBN-10
1563271826
ISBN-13
9781563271823
eBay Product ID (ePID)
646311

Product Key Features

Number of Pages
248 Pages
Language
English
Publication Name
Integrating Kanban with Mrpii : Automating a Pull System for Enhanced Jit Inventory Management
Publication Year
1997
Subject
Industries / Manufacturing
Type
Textbook
Subject Area
Business & Economics
Author
Raymond J. Louis
Format
Book, Hardcover

Dimensions

Item Height
0.8 in
Item Weight
17.6 Oz
Item Length
9.3 in
Item Width
6.2 in

Additional Product Features

LCCN
97-028312
Dewey Edition
21
Target Audience
Scholarly & Professional
Illustrated
Yes
Dewey Decimal
658.5/1
Lc Classification Number
Ts1600.L7 1997
Table of Content
Chapters Eliminate Replenishment System Waste Replenishment System Basics Automated Kanban -- The Automated Flow Technology Kanban Prerequisites -- WCM Techniques Implementing Kanban Kanban and MRPII System Integration AFT Caculations for Determining Kanban Lot Sizes and Staffing Levels Perpetuation of the Automated Kanban Key Topics of the Automated Kanban System Three examples of AFT Implementation

Item description from the seller

About this seller

nautilus one fifty

100% positive feedback1.2K items sold

Joined Oct 2002
Usually responds within 24 hours

Detailed Seller Ratings

Average for the last 12 months
Accurate description
4.9
Reasonable shipping cost
4.9
Shipping speed
5.0
Communication
5.0

Seller feedback (434)

All ratings
Positive
Neutral
Negative
  • w***r (563)- Feedback left by buyer.
    Past 6 months
    Verified purchase
    Great service.
  • o***a (955)- Feedback left by buyer.
    Past 6 months
    Verified purchase
    Excellent!!! Thank you. A+++
  • t***g (44)- Feedback left by buyer.
    Past 6 months
    Verified purchase
    It installed easily and had all the needed components. Arrived well packaged with no damage.